Waiting area at Mennonite Christian Hospital designed with whale and ocean motifs
WELL Case Study | Healthcare

Mennonite Christian Hospital

Taiwan's first hospital to achieve WELL certification for an entire building. From the air and water people cannot see to quieter consultation rooms and rest spaces for staff, the hospital uses the WELL Building Standard to care for everyone who visits, works and recovers here.

Location Hualien City, Taiwan
Building type Hospital / Health Management Center
Size 2 basement levels, 5 floors above ground
Architect J.J. Pan & Partners
Certification WELL v2 Gold (September 23, 2026)
GreenJump's role WELL consultant
Highlights

Taiwan's first whole-building WELL certified hospital

Mennonite Christian Hospital in Hualien achieved WELL v2 Gold on September 23, 2026, becoming the first hospital in Taiwan to earn WELL certification for an entire building. GreenJump served as the WELL consultant. The hospital first received WELL Precertification in July 2024, about two years before Gold.

WELL Gold means a project scores 60 points or more and passes third-party documentation review and on-site performance verification. As of October 2026, only about 15 hospitals worldwide have achieved WELL certification.

Gold WELL certification, September 23, 2026
−20 dB Consultation room noise: 67.0 dB → 46.7 dB
No. 1 Whole-building WELL certified hospital in Taiwan
≈15 WELL certified hospitals worldwide
The Challenge

Why do hospitals need healthy buildings?

Hospitals run 24 hours a day. Patients, families and medical staff spend long hours indoors, so air, light and sound affect body and mind more directly than in most buildings.

Research shows that window views and daylight in patient rooms influence recovery and pain medication use. Patients with a view of trees after surgery had shorter stays and needed fewer strong painkillers (Ulrich, Science, 1984); patients in sunnier rooms used 22% less pain medication per hour (Walch et al., Psychosomatic Medicine, 2005). The hospital's new Health Management Center, opened in 2026, treated health as a design goal from the start and adopted the WELL Building Standard to extend care into the space itself.

Our Approach

Five ways the hospital put WELL into practice

The hospital implemented WELL across five areas that map to WELL's ten concepts. Most measures live in daily operations and maintenance, not just on the drawings.

Electrostatic air filter in the HVAC system
Air Water

Air and water

Electrostatic air filters added to the HVAC system and maintained regularly; drinking water quality tested and recorded, bringing invisible health risks under management.

Measuring equipment noise with a sound level meter
Light Thermal Comfort Sound

Environmental comfort

Daylight with adjustable shading and personal fans; consultation room noise dropped from 67.0 dB to 46.7 dB after improvements.

Upgraded stairwell
Nourishment Movement

Behavior and health

A comfortable dining environment that promotes mindful eating, and upgraded stairwells that make taking the stairs a more natural choice.

Automated external defibrillator (AED)
Materials Community

Safety and hygiene

Standard cleaning and disinfection procedures that reduce unnecessary chemical exposure, plus automated external defibrillators (AEDs) placed proactively and included in routine maintenance.

Tree-themed lobby
Mind

Aesthetics and people

Whales, flowers and great trees link the public spaces, turning Hualien's mountains and sea into a healing language that eases anxiety for patients and children.

Caring for Caregivers

How WELL cares for medical staff

WELL looks beyond the patient environment and includes staff health and wellbeing in its requirements. Before caring for patients, the hospital cared for its caregivers:

  • A yoga room converted into a restorative space with bean bags and privacy curtains, giving staff a place to breathe between high-pressure shifts
  • Height-adjustable desks and ergonomic assessments to reduce the burden of prolonged sitting and poor posture
  • A staff fitness center in the new building, with workout space overlooking the Hualien landscape
A Small Story

A mobile clinic's second journey

A mobile medical van that once carried doctors and nurses into Hualien's remote villages was not scrapped when it retired. It was converted into the "Giraffe Car" reading corner on the children's floor, parked under a big tree where children read while they wait. This is the spirit of WELL's Mind concept: good spaces help people relax and carry the stories and memories of a hospital.

The Journey

The road to WELL Gold

From the 2022 groundbreaking pledge to WELL Gold took about four years.

  • 2015 Planning begins for the Health Management Center
  • May 2022 Groundbreaking ceremony; the hospital commits to pursuing WELL certification
  • Mar 2024 Topping out, overcoming pandemic-era labor and material shortages
  • Jul 2024 WELL Precertification achieved
  • Jun 11, 2026 Dedication service and opening exhibition; GreenJump presents the hospital's WELL practices
  • Sep 23, 2026 WELL v2 Gold achieved: Taiwan's first whole-building WELL certified hospital
Sources

Mennonite Christian Hospital official blog (June 12, 2026); Central News Agency (March 7, 2024); Ulrich, R. S. (1984), Science, 224, 420–421; Walch, J. M. et al. (2005), Psychosomatic Medicine, 67(1), 156–163; IWBI WELL v2 and WELL Precertification documentation; IWBI press release (January 29, 2026); Footscray Hospital (October 20, 2026).

Work with GreenJump

Make your building a place that cares for people

GreenJump is a WELL consultancy based in Taipei, Taiwan. We guide projects from strategy and documentation to on-site performance verification.

Subscribe to the GreenJump newsletter

Regular insights on green buildings, sustainable real estate, ESG trends, regulations and events.