Chenyeh Chemical Works
Chenyeh Chemical Works Existing Office Building
A green building awarded LEED-O+M Gold certification
01 Background
Project Background
This commercial building of Chenyeh Chemical Works Co., Ltd. (hereafter "the building" or "the Chenyeh Building") has a total floor area of 10,259 m² and stands 11 stories tall (including one basement level), rising above the busy traffic of Chengde Road. It is also a green building awarded LEED-O+M Gold certification. In keeping with the spirit of green building, the site was chosen with care: it had to be in a highly developed commercial district and close to public transit. According to a survey, 45% of all building occupants switch modes of transportation before arriving at the building, showing how convenient the location is for its users.
Because the LEED certification Chenyeh applied for was for an existing building rather than a new one, the design had to be considered even more comprehensively in order to preserve the building's original functions while adding innovative elements. GreenJump introduced many design measures throughout the project, giving the Chenyeh Building a fresh new look after certification:
02 Results
Measurable results
45 %
Switch modes before arriving
45% of all building occupants switch modes of transportation before arriving at the building
50 %
Less irrigation water
Drought-tolerant plants with a water-efficient irrigation system
40 %
Recycling rate
Through a Waste Stream Audit
80 %
Sustainable cleaning products
More than 80% of cleaning product spending goes to products meeting sustainability criteria
03 Green building strategies
Green Building Strategies
Grouped by LEED credit category.
Sustainable Sites
SSReflective coating on the roof effectively reduces the heat island effect.
Water Efficiency
WEDrought-tolerant plants in the landscape design and a water-efficient irrigation system reduce irrigation water use by 50%.
Energy and Atmosphere
EA"Current Facility Request" and "Operation and Maintenance" plans were adopted, and Level 1 & 2 energy audits were carried out to ensure that energy efficiency is maintained.
Materials and Resources
MRThe project team established a purchasing policy and a waste management policy, and a Waste Stream Audit raised the recycling rate to 40%.
Indoor Environmental Quality
EQProducts meeting sustainability criteria are used, accounting for more than 80% of spending on current cleaning products (detergents, toilet paper, etc.) and more than 50% of spending on cleaning equipment (vacuum cleaners, etc.), ensuring indoor environmental quality.
04 After certification
After Certification
For Chenyeh, the award was not an end but the start of another round of innovation. GreenJump therefore also planned at the time to guide Chenyeh through a green building education program, including green building design tours of the building and green building digital signage, in the hope of encouraging people to bring green building design into every aspect of their lives, so that the concept of green building stands firm and spreads widely through the community.
05 FAQ
FAQ
What certification has the Chenyeh Chemical Works existing office building achieved?
How can an existing building achieve LEED O+M certification?
How does the Chenyeh Building save water and reduce the heat island effect?
What green building considerations shaped the Chenyeh Building's location?
Work with GreenJump
Plan your LEED certification with GreenJump
GreenJump is a LEED consultancy based in Taipei, Taiwan, supporting both new construction and operations and maintenance certification for existing buildings from start to finish.