Embodied carbon, counted before the design is fixed
Taiwan's low-carbon building label (LEBR) measures a building's embodied carbon from material production to demolition. It is being phased in for public buildings from July 2027 and is already required by Taipei EIA reviews and New Taipei urban renewal. GreenJump steps in during design, turns structural, facade and partition options into ratings, and plans them together with the green building label and the building energy label.
01 Why now
Why plan for LEBR now
The carbon reduction rate depends mostly on the structural system and construction type, which are hard to change once massing is fixed. And the places that require it grow every year.
Phased in for public buildings
New public buildings with a total construction budget of NT$50 million or more, starting with offices, must apply for it together with the green building label and energy rating; level 2 or better through 2029, and level 1 or better from 2030.
Guidelines for whole-life energy and carbon reduction in public building works
Taipei EIA threshold
Since November 13, 2024, new buildings in Taipei EIA cases must obtain the low-carbon building label at level 4 or better within two years of the use permit; New Taipei urban renewal units of 2,000 m² or more need level 3.
Taipei EIA review standards; New Taipei urban renewal review principles
Low embodied carbon added to the green building label
The 2026 Green Building Evaluation Manual turns the CO2 Reduction and Waste Reduction indicators into Low Embodied Carbon, scored on the LEBR reduction rate and mandatory from July 2030.
Architecture and Building Research Institute, June 2026
Green budget recognition with all three labels
Public buildings holding the green building, energy and low-carbon labels can have their full construction budget recognized as green spending; the FSC taxonomy guidelines also list low-carbon level 2 as one test for new buildings.
Public building guidelines; FSC Taiwan Sustainable Taxonomy guidelines
02 Ratings & scope
How LEBR rates buildings, and what it counts
LEBR compares the embodied carbon of the design with the manual's baseline case, calculates the carbon reduction rate (CFR) and converts it into a level. Level 4 or better is a low-carbon building, and 1+ is an ultra-low-carbon building.
Levels and carbon reduction rate
| Level | Carbon reduction rate (CFR) | Meaning |
|---|---|---|
| 1+ | 20% or more | Ultra-low-carbon building |
| 1 | Over 16%, under 20% | Low-carbon building |
| 2 | Over 12%, up to 16% | Low-carbon building |
| 3 | Over 8%, up to 12% | Low-carbon building |
| 4 | Over 3%, up to 8% | Low-carbon threshold |
| 5–7 | 3% or less | Not a low-carbon building |
The carbon reduction rate (CFR) is the share of embodied carbon the design saves against the manual's baseline case. The scope follows the EN 15978 life-cycle stages, covering material production and transport, construction, repairs and replacement in use, and demolition and disposal (excluding operational energy and water); basements are counted for emissions but not for the rating.
Main components calculated
Structural system, spans and plan regularity
Construction type and materials
Frames and glass
Drywall or masonry
Finishes and base layers
Low-carbon materials and methods, reused materials, extended service life
How LEBR, BERS and the green building label divide the work
| LEBR low-carbon building label | BERS energy label | EEWH green building label | |
|---|---|---|---|
| What it rates | Embodied carbon: material production and transport, construction, repairs, demolition and disposal | Operational carbon: energy for air conditioning, lighting and more | Combined indicators across ecology, energy, waste and health |
| Levels | Levels 1+ and 1–7 | Levels 1+ and 1–7, plus the "zero" label | Certified to Diamond |
| What 1+ means | Ultra-low-carbon building | Nearly zero carbon building | Not applicable |
| Validity | Label has no expiry; candidate certificate 5 years | 5 years | 5 years |
| GreenJump service | This page | BERS consulting | Green building consulting |
The three labels can be applied for separately or together; one set of drawings and quantities can support all three calculations.
03 What we do
What our LEBR consulting covers
Every step from level estimate to label comes with its own calculations and documents.
Level estimate
Estimate the carbon reduction rate from drawings to see which level the design is at and how far it is from the target.
Embodied carbon calculation
Build the design and baseline cases under the 2025 manual and calculate the embodied carbon of the main structure, external walls and windows, curtain walls, interior partitions and indoor and outdoor floors.
Carbon reduction design advice
Find the most effective combination among structural spans and plan regularity, construction type, low-carbon concrete, low-carbon recycled materials and methods, reused materials and extended service life.
Submission documents
Prepare the assessment summary, rating scoresheet and other documents, apply to the Taiwan Architecture and Building Center (TABC) for evaluation and respond to corrections.
Site inspection and approval
For the final label, compile evidence of actual deliveries and construction, support the site inspection and apply to the Ministry of the Interior for approval.
Integrated label planning
Plan it together with the green building label, the building energy label and LEED, sharing drawings and calculations to avoid duplicate work.
04 How we work
From design to the label
The earlier you start, the more room there is. A level estimate before massing and structure are fixed is the most cost-effective moment.
01
Design: level estimate and strategy
Before massing is fixed
- Estimate the reduction rate and achievable level
- Compare structural, facade and partition options
- Propose design changes to reach the target level
You receive Level estimate and comparison of reduction options
02
Candidate low-carbon certificate
After the building permit
- Complete calculations and documents
- TABC evaluation (30 days by regulation)
- Apply to the Ministry of the Interior for approval
You receive Candidate low-carbon building certificate
03
Construction: materials and methods
Construction phase
- Track low-carbon concrete mixes and material deliveries
- Check embodied carbon of design changes
- Help with re-evaluation when changes occur
You receive Delivery and construction evidence, change evaluation documents
04
Low-carbon building label
After the use permit
- Prepare completion data
- Document evaluation, site inspection and evaluation meeting (50 days by regulation)
- Apply to the Ministry of the Interior for approval
You receive Low-carbon building label
05
Disclosure and reuse
After the label
- Data reused for the low embodied carbon indicator of the green building label
- Evidence for sustainability reports and green finance
- Links to LEED v5 embodied carbon and international disclosure
You receive Reusable embodied carbon data
Projects without a building permit can apply for candidate certificate evaluation first and submit the permit within three months of passing.
Why GreenJump
Low-carbon, green building and energy labels together
All three labels share one set of drawings and quantities, and GreenJump also consults on the green building label and BERS, so nothing needs to be subcontracted.
Modeling and calculation in one team
GreenJump has its own energy modeling and CFD team, so embodied and operational carbon are weighed together rather than cutting one at the expense of the other.
A local rating that reads internationally
Taiwan's LEBR uses a reduction rate against a baseline case, while LEED v5 and the EU use absolute whole-life carbon. One set of calculations can produce both results.
In from the start of design
Structural spans, plan regularity and construction type determine most of the reduction rate. GreenJump puts comparable options on the table before massing is fixed.
05 Global context
Abroad, embodied carbon is moving from disclosure to limits
Several European countries already cap the whole-life carbon of new buildings, and LEED v5 makes embodied carbon quantification a prerequisite.
| System | Approach | Timeline |
|---|---|---|
| Revised EU EPBD | New buildings must calculate whole-life carbon (GWP) and disclose it in the energy performance certificate; member states must set out reduction roadmaps | Disclosure for new buildings over 1,000 m² from 2028 and all new buildings from 2030; limits from 2030 |
| Danish building regulations | Four limits by building type and size, averaging 7.1 kg CO2e per m² per year | From 2025 |
| French RE2020 | Material and construction carbon (Ic construction) limits fall in stages, for example detached houses 640 → 530 → 475 → 415 kg CO2e/m² | Steps every 3 years from 2022 |
| Dutch MPG | Limits on environmental shadow cost (euros per m² per year); a new method from July 2026 tightens offices by about 15% | Mandatory |
| UK RICS | Whole Life Carbon Assessment standard, 2nd edition, mandatory for RICS members carrying out assessments | In full effect from July 1, 2024 |
| LEED v5 | Embodied carbon quantification (MRp2) is a prerequisite; reductions earn points | From 2025 |
Taiwan's LEBR is a reduction rate against a baseline case, while Europe mostly sets absolute limits. For projects linked to EU supply chains, foreign headquarters or LEED v5, the calculations should also produce absolute values (kg CO2e/m²).
Low-carbon building labels (as of December 2025)
Plus 15 candidate certificates; private buildings account for 14 in total, so voluntary applications are already the majority.
Architecture and Building Research Institute, second ceremony
Low-carbon recycled materials recognized by ABRI
Plus 5 low-carbon construction methods; these materials and methods earn reduction credits in the LEBR calculation.
Architecture and Building Research Institute, December 2025
Ultra-low-carbon examples in social housing and public buildings
Social housing projects at the first ceremony reached reduction rates of 21% to 29%; 2025 level 1+ labels include the Taiwan Business Bank Puli branch.
Ministry of the Interior, November 2024; ABRI, December 2025
06 Cost & time
Cost and time, worked out up front
The cost of LEBR has four parts. Official fees and TABC evaluation fees are public, so we calculate them for you.
01
Ministry of the Interior fees
NT$800 review fee plus NT$200 certificate fee
02
TABC evaluation fee
By total floor area; a site inspection fee for the final label
03
Consulting calculation services
Embodied carbon calculation, reduction advice and documents, quoted per project
04
Cost of carbon reduction design
Structural optimization, low-carbon concrete and materials; varies widely by design
Official fee estimator
- TABC document evaluation fee
- NT$ —
- Site inspection fee
- NT$ —
- Ministry of the Interior fees
- NT$ —
- Total official fees
- NT$ —
Estimated from the TABC low-carbon building label fee schedule and Ministry of the Interior fees; document fees are halved for design changes or certificate extensions. Consulting fees are not included, and the latest TABC schedule applies.
Statutory evaluation periods (excluding corrections)
| Candidate low-carbon certificate | 30 days Evaluated by TABC, then approval from the Ministry of the Interior |
| Low-carbon building label | 50 days Document evaluation, site inspection and evaluation meeting |
| With a candidate certificate | 25 days When applying for the label after design changes are reviewed by the original evaluator and pass acceptance |
| Validity | Label has no expiry The candidate certificate lasts 5 years and can be extended where eligible |
- Correction time does not count toward the evaluation period: corrections are due within 30 days, extendable once by 30 days.
- A project follows the manual in force on the date of the building permit application or the evaluation application; the 2025 manual has applied since July 1, 2026.
How consulting fees are quoted
Consulting fees are quoted per project and depend on the four things below. Tell us these four and we can estimate the full budget.
- 01 Total floor area and structural system Area and structural complexity set the amount of quantity calculation.
- 02 Target level Level 1+ needs more option comparisons and design integration.
- 03 Stage at which we join Joining before massing is fixed allows the most options; after the building permit, the work is mainly calculation and submission.
- 04 Whether other labels are included Doing it together with the green building label, BERS or LEED shares drawings and quantities.
TABC evaluation fees and Ministry of the Interior fees are a separate cost, which the estimator above can approximate.
07 FAQ
Frequently asked questions
What is the LEBR low-carbon building label?
What does LEBR consulting include?
When is the best time to start on LEBR?
Does my project have to apply for the low-carbon building label?
How long does it take to get the low-carbon building label?
How much does the low-carbon building label cost?
Can LEBR be applied for together with the green building label and BERS?
Which LEBR manual applies now?
How long is the low-carbon building label valid?
Can low-carbon concrete raise the level?
How does LEBR differ from LEED v5 and EU embodied carbon rules?
How are LEBR consulting fees calculated?
Sources and update date
Regulations and figures on this page were checked on November 15, 2026; if the system changes, announcements by ABRI and TABC prevail.
Sources: ABRI: low (embodied) carbon building rating (in Chinese) ・ Low-carbon building label guidelines issued (January 2024; in Chinese) ・ TABC: 2025 manual in force from July 1, 2026 (in Chinese) ・ TABC LEBR fee schedule (in Chinese) ・ Guidelines for whole-life energy and carbon reduction in public building works (in Chinese) ・ Taipei EIA review standards (in Chinese) ・ New Taipei urban renewal review principles (in Chinese) ・ ABRI: second low-carbon building label ceremony (December 2025; in Chinese) ・ European Commission: EPBD ・ European Environment Agency: Danish building carbon limits ・ RICS Whole Life Carbon Assessment standard, 2nd edition
Want to know which level your project can reach?
Tell us the project size and current design stage, and a GreenJump consultant will explain how the level is assessed and which reduction options work.
- 1 A conversation of about 30 minutes We learn about your project and goals.
- 2 Three things to prepare Project size, structural system and current design stage.
- 3 What you'll get How the level is assessed, workable carbon reduction options and how the cost breaks down.