Global Footwear Service Group Factory in Indonesia
People-centered design for employees: better production line layout and a more comfortable factory
Aerial illustration of the factory campus
01 Overview
Project Overview
GreenJump provided building physics and energy simulation for a factory in Indonesia owned by a world-renowned footwear service group. The simulations covered indoor ventilation, thermal comfort, daylighting and energy.
Design priorities
- Improving comfort in the factory as the design goal
- People-centered design with employees as the starting point
- Breaking away from conventional factory design
- Improving the production line layout to raise comfort
- The design optimization findings can be developed further and applied to future factory designs
02 Simulations
Four Simulations
The simulation types used in this project.
Indoor ventilation
Indoor ventilationSimulates airflow inside the factory as a basis for improving the production line layout.
Thermal comfort simulation
Thermal comfortAssesses the thermal comfort of employees working in the factory.
Daylighting simulation
DaylightingAssesses how natural light enters the factory.
Energy simulation
Energy simulationEstimates the energy use of the factory so that comfort and energy savings are considered together.
03 FAQ
FAQ
What building simulations were carried out for the footwear group's factory in Indonesia?
What was the design goal of this factory project?
How did simulation improve comfort in the factory?
How large is the factory?
Are the simulation findings used only for this factory?
Work with GreenJump
Make design decisions with simulation, with GreenJump
GreenJump provides building physics simulation, including wind, energy, daylight and thermal comfort, to find more comfortable and more energy-efficient options at the design stage.