Building physics and energy simulation
Office and Factory Campus
Simulation found the optimal envelope ratio and kept wind comfortable on the site and the upper outdoor platform
Exterior of the campus (rendering)
01 Overview
Project Overview
GreenJump provided building physics and energy simulation for a mixed office and factory campus in New Taipei City. The simulations covered outdoor pedestrian wind and energy.
People-centered architectural design improves comfort in both the office buildings and the factory buildings.
Aerial view of the campus (rendering)
02 Design outcomes
Design Outcomes from Simulation

Outdoor pedestrian wind
Pedestrian wind simulationAssesses the wind environment people experience at ground level on the site and on the upper outdoor platform.
- Wind conditions are comfortable both on the site and on the upper outdoor platform
Energy simulation and building envelope
Energy simulation- Energy simulation identified the optimal envelope ratio
- Glass curtain walls combined with metal panels reduce heat radiation from the facade
Site greenery
Landscape- Extensive greenery on the site increases carbon sequestration.
03 FAQ
FAQ
What building simulations were carried out for the office and factory campus?
What did the pedestrian wind simulation show?
How did energy simulation shape the building envelope?
How large is the campus?
Besides simulation, what else defines the campus design?
Work with GreenJump
Make design decisions with simulation, with GreenJump
GreenJump provides building physics simulation, including wind, energy, daylight and thermal comfort, to find more comfortable and more energy-efficient options at the design stage.

